The U.S. Army Corps of Engineers Transatlantic Division serves as USACE’s tip of the spear in one of the most dynamic construction environments in the world, STRENGTHENING PARTNERSHIPS, BUILDING CAPACITY, and ENHANCING SECURITY for our nation, allies, and partners. 

We SAFELY deliver agile, responsive, and innovative, design, construction, engineering and contingency solutions in support of U.S. Central Command, U.S. Special Operations Command and other global partners to advance national security interests.

Results:
Archive: 2019
Clear
  • September

    District closes RI/FS at former Nike C-47 ahead of schedule

    The Louisville District completed the Remedial Investigation/Feasibility Study ahead of schedule for
  • Buffalo District Regulatory biologist participates in National Strong Leaders Program

    Buffalo District’s own Regulatory biologist, Peter Krakowiak was selected for the inaugural class of the Regulatory Strong Leaders Program (SLP), created to help develop future leaders within the Regulatory Program by providing a broad approach to effective leadership.
  • Far East District softball team opens season with a victory

    CAMP HUMPHREYS, South Korea—The U.S. Army Corps of Engineers, Far East District, softball team
  • From sticks to STEM – USACE and STARBASE work to build the future

    What do you get when you combine 14 glue guns, 700 popsicle sticks, 26 school kids and a U.S. Army Corps of Engineers colonel? Two hours of fun, learning and LOTS of laughter!
  • District Commander on the road (Part 4)

    This is the fourth installment of Col. Zachary Miller’s recent road trip around the district. Another culvert project was the impetus for this stop. Bobby Carlyle from our Caruthersville Area Office was also the USACE point man on this job. The Mound City to Cairo Levee is located along the Ohio River in the southern tip of Illinois and protects Mound City and Pulaski County, Ill. This project will replace an existing 30-inch diameter corrugated metal pipe with a 48-inch diameter reinforced concrete pipe. The culvert will also feature a flap gate to prevent backflow when water is high, and a sluice gate to prevent reverse flow.